← Archive ‹› July 8, 2026Jul 8 Archived design. See today’s → How it was madeHow
Doug March logoDOUG MARCH
WEDNESDAY โ€” JULY 8, 2026

AI ยท 2026

dougmar.ch

Designer & Builder

PROBLEM

Most portfolio sites are static โ€” built once, then abandoned. The design decisions are invisible, the process is hidden, and the whole thing slowly drifts out of date.

APPROACH

A daily redesign pipeline powered by Claude. Each morning, a multi-agent system reads live signals โ€” golf leaderboard, Hacker News, sports scores โ€” and generates a fresh visual design from scratch. A design director agent sets the creative direction, a token designer defines the type and spacing scale, and a layout engineer assembles the final output. The design is archived automatically with a brief explaining what changed and why. The entire pipeline runs in CI.

OUTCOME

A portfolio that is never the same two days in a row. Every design is saved to an archive. The stack is TanStack Start in SPA mode, PandaCSS for tokens, and Vercel for hosting and CI.

STACK

TanStack Start

PandaCSS

TypeScript

Claude

GitHub Actions

Vercel